Archive
Holly Drive and 50th Street
Our team prepared and performed all necessary engineering design and due diligence for improvements to Holly Drive and the Holly Drive/50th Street intersection. Services included survey, design, permitting, and construction administration. The following improvements were completed: Added a right-turn lane on Holly Drive from Sycamore Drive to 50th Street. Added two 4-foot bike lanes and… Read More »
Sheboygan CTH J Rural Design
The Sheboygan County Highway Department retained Ayres to provide design and specifications for upgrading 2 miles of CTH J. The purpose of the project was to upgrade the roadway cross section and vertical curves to current highway standards and improve drainage. The project involved reconstructing the roadway with 12-foot lanes and 6-foot gravel shoulders, upgrading… Read More »
Wozny Road Bridge over Totagatic River
The Town of Frog Creek and the Washburn County Highway Department retained Ayres to design a replacement for the narrow Wozny Road bridge over the Totagatic River. The original bridge was a multi-cell concrete structure with stoplogs functioning as a dam owned by the Wisconsin Department of Natural Resources (WDNR). Alternatives for removing the existing… Read More »
