Archive
Orchard Mesa Detention Pond
In 2009 Ayres delineated a floodplain for Orchard Mesa. Ayres developed a master plan, conceptually designing several alternatives to mitigate flooding in the area. Mesa County acquired grant funding for one of the proposed projects, a detention pond located on the Mesa County Fairgrounds, and retained Ayres and DHM to design the pond to meet… Read More »
Ozaukee County STH 33
This project connects the Village of Saukville with the City of Port Washington on STH 33. The 1.5-mile, two-lane rural undivided minor arterial was under heavy commercial and residential development pressure.The project reconstructed the roadway with added capacity by implementing a divided four-lane facility with left-turn lanes for major side roads; two multi-lane roundabouts at… Read More »
Sherwood Wanick Park
The Village of Sherwood retained our team to produce a conceptual master plan for the 34-acre Wanick Park. In tandem with the Village’s Parks, Recreation and Urban Tree Board, our team developed the collective vision to transform the park into a community destination.The park’s design concept sought to abstract the character of nearby High Cliff… Read More »