Archive
Grafton Bridge Street Dam
This dam project required both technical skill and sensitivity to the role the facility plays in the identity of the Village of Grafton. Ayres designed increased spillway capacity for the Bridge Street Dam, whose arch-shaped spillway in the heart of downtown Grafton is a focal point of the community. The upstream impoundment includes a pedestrian… Read More »
I-90 / US 53 / STH 35 Interchange
The Wisconsin Department of Transportation (WisDOT), Southwest Region, retained Ayres to design the reconstruction of the US 53/STH 35 interchange with I-90 at La Crosse, along with reconditioning 2.4 miles of I-90 and improvements for 13 bridges along the segment. The project required a wide breadth of transportation engineering expertise to create a welcoming interstate… Read More »
Keystone Road Design
Pinellas County retained Ayres to provide design engineering services for the reconstruction of 3 miles of congested Keystone Road to an urban four-lane raised-median divided roadway section with future widening to six lanes. The existing two-lane facility was inadequate for increasing traffic volumes. The design provided sidewalks on each side of the roadway. For about… Read More »
