Archive
Medford East Side Sewer Interceptor
The City of Medford retained Ayres for the design, bidding, and construction of the east side interceptor sewer to provide gravity drainage to an extended service area and to eliminate a lift station, thereby controlling operation and maintenance costs. The route was challenging, going through wetlands and along a stream corridor. Our team was able… Read More »
Solon Springs Wastewater
The Village of Solon Springs’ wastewater treatment system uses stabilization ponds with groundwater discharge. When the Wisconsin Department of Natural Resources required the Village to upgrade its system, the Village called on Ayres for assistance. Ayres completed a facility plan and identified expanded stabilization ponds as the preferred solution. This alternative provides a system that… Read More »
