Archive
US 8 Pavement and Roundabout
The Wisconsin Department of Transportation, Northwest Region, retained Ayres to prepare preliminary and final plans for pavement replacement on US 8/STH 35 in St. Croix Falls. WisDOT contracted separately with Ayres to design the US 8/208th Street intersection as a roundabout. The 2.3-mile pavement replacement project included joint repair and overlay of an existing brake… Read More »
Ozaukee County STH 33
This project connects the Village of Saukville with the City of Port Washington on STH 33. The 1.5-mile, two-lane rural undivided minor arterial was under heavy commercial and residential development pressure.The project reconstructed the roadway with added capacity by implementing a divided four-lane facility with left-turn lanes for major side roads; two multi-lane roundabouts at… Read More »
Tainter Lake Bridge
The historic truss bridge over the Red Cedar River needed replacement, but the design of the new structure was just part of this project. Ayres participated in several public meetings with residents and businesses because of concerns over project scheduling and the detour that the bridge’s closure would cause. Extensive historic documentation was required as… Read More »
