Archive

East Pershing Corridor Design

The City of Cheyenne, Wyoming, retained Ayres to provide roadway and utility design and construction engineering for reconstruction of a portion of East Pershing Boulevard, including reconstruction of one intersection as a five-leg, multi-lane roundabout. The project included extensive public outreach, right-of-way survey, a plan for phased construction to minimize traffic disruption, design of modular-block… Read More »

SR 13 Resurfacing

The Florida Department of Transportation (FDOT), District 2, hired Ayres to design the resurfacing of SR 13 (San Jose Boulevard) from Sunbeam Road to Cornell Road. The approximately 4.75-mile project included pavement milling and resurfacing and improvements to intersections, horizontal alignment, curb and gutter, drainage, median, signing and marking, and three bridges. This resurfacing, restoration,… Read More »

US 8 Pavement and Roundabout

The Wisconsin Department of Transportation, Northwest Region, retained Ayres to prepare preliminary and final plans for pavement replacement on US 8/STH 35 in St. Croix Falls. WisDOT contracted separately with Ayres to design the US 8/208th Street intersection as a roundabout. The 2.3-mile pavement replacement project included joint repair and overlay of an existing brake… Read More »