Archive
Sheboygan CTH J Rural Design
The Sheboygan County Highway Department retained Ayres to provide design and specifications for upgrading 2 miles of CTH J. The purpose of the project was to upgrade the roadway cross section and vertical curves to current highway standards and improve drainage. The project involved reconstructing the roadway with 12-foot lanes and 6-foot gravel shoulders, upgrading… Read More »
Wozny Road Bridge over Totagatic River
The Town of Frog Creek and the Washburn County Highway Department retained Ayres to design a replacement for the narrow Wozny Road bridge over the Totagatic River. The original bridge was a multi-cell concrete structure with stoplogs functioning as a dam owned by the Wisconsin Department of Natural Resources (WDNR). Alternatives for removing the existing… Read More »
Fox Point Footbridge
The Village of Fox Point retained Ayres to evaluate alternatives for the Bridge Lane Ravine Footbridge and provide necessary design work. Services involved preparing preliminary designs and cost estimates for each of the three alternatives: repair/rehabilitation, replacement, and removal of the bridge. Replacement was chosen as the preferred solution. The project won a 2015 Public… Read More »
