Archive
Fletcher Avenue Bridge Repairs
This task involved inspection services and engineering design after a water main break caused erosion under the westbound lanes of East Fletcher Avenue, causing significant erosion around the Fletcher Avenue Bridge over the Hillsborough River. Services included investigation and testing to determine the extent of the damage and develop a repair and restoration plan. Services… Read More »
DeForest South Street Bridge
The Village of DeForest and the Wisconsin Department of Transportation selected Ayres to design a bridge replacement along South Street over the Yahara River. The project included removing the deteriorated single-span two-lane bridge and replacing it with a single-span, two-lane structure, including sidewalk, lighting, and decorative railing along one side of the bridge. Aesthetic treatments… Read More »
Boyette Road over Fish Hawk Creek
This project involved designing the replacement of a box culvert with a precast twin-cell box culvert after an inspection of the Boyette Road over Fish Hawk Creek Branch structure showed a 12.5-foot-long continuous void in the interior wall, starting at the junction with the floor slab that is 8 inches high and 12.5 feet long.… Read More »