Archive

Langlade CTH C Bridges

Langlade County retained Ayres to design three bridge replacements on CTH C. The County packaged the projects to reduce construction mobilization costs. Approximately 260 feet of approach work was completed for each bridge. Services included survey; hydraulics; environmental documentation; preliminary bridge and roadway plans; and final bridge and roadway plans, specifications, and estimates.The bridge over… Read More »

Sleepy Valley Loop over Middle River Bridge

The Town of Lakeside, Douglas County, hired Ayres to design the replacement of the bridge carrying Sleepy Valley Loop over the Middle River. The existing steel truss bridge was determined eligible for the National Historic Register. Removal of the historic bridge was mitigated through photographic documentation of the bridge and development of website content for… Read More »

14th Street Roundabout

Nassau County retained Ayres to provide engineering design, final plans and specifications, and construction administration for construction of a roundabout at the intersection of South 14th Street and Amelia Island Parkway, just north of the Fernandina Beach Airport. The existing three-leg intersection consisted of two-lane rural roadways with separate turn lanes on all three legs.… Read More »