Archive

US 41 Brown County

This project is one of several segments of the US 41 Corridor that will be expanded from four to six lanes to increase capacity along the highway in Brown and Winnebago Counties as part of a $1.5 billion mega project. The construction cost for this segment was approximately $240 million. Ayres’ services for this section… Read More »

Dane CTH PD Pedestrian Bridge

Dane CTH PD (McKee Road) in Madison was reconstructed to an urban boulevard arterial with four vehicular travel lanes, two bike lanes, sidewalk, terrace, and curb and gutter. As part of the design team, Ayres designed a new multi-use path bridge over CTH PD for the Ice Age Junction Path system. The bridge is a… Read More »

Pleasant View Road Design

The City of Madison selected Ayres to complete the environmental document, design reports, agency coordination, traffic analysis, utility coordination, public involvement, survey, plat preparation, preliminary and final roadway plans, and culvert underpass and retaining wall plans for the Pleasant View Road project. The new corridor was designed within a tight time frame as a four-lane… Read More »