Archive
ATC Access Road
Ayres assisted with the replacement of a transmission line along a 30-mile corridor between Boscobel and Lone Rock in southwest Wisconsin. A significant task of this project involved design and plan preparation for a new 1.5-mile access road to aid in the construction of the new line on the bluffs above the Wisconsin River and… Read More »
Palatka Water Reuse System Expansion
Ayres provided engineering services for the expansion of the reclaimed water reuse pump station to a 2.5-million-gallons-per-day facility, along with transmission/distribution systems. The reclaimed water serves areas next to the existing wastewater effluent holding pond at the City of Palatka Municipal Golf Course. The project included designing approximately 14,900 linear feet of 16-inch PVC reclaimed… Read More »
Rock County New CTH BT
Rock County hired Ayres to analyze several alternatives and prepare final plans and specifications for a new connector route between CTH G and CTH S at the north edge of the City of Beloit near the IH 39 interchange. The selected alternative included a 240-foot-long new bridge over Turtle Creek. This selected route also included… Read More »
