Archive

Eau Claire CTH AA over Otter Creek

Eau Claire County hired Ayres to design the replacement of the bridge that carries CTH AA (Prill Road) over Otter Creek about 0.7 mile east of USH 53 in the Town of Washington. Planning for the future needs of this evolving location on the east edge of a busy commercial district, our engineers provided a… Read More »

Menasha Third Street Bridge

The City of Menasha hired Ayres to design the replacement of the Third Street bridge over the Lake Winnebago Slough on an accelerated schedule, along with reconstruction of the bridge approaches. This project involved replacing a single-span concrete deck girder bridge approximately 0.6 mile east of Third Street’s junction with STH 114. The previous structure… Read More »

Chippewa CTH X Bridge

Chippewa County retained Ayres to design the replacement of the CTH X bridge over Hay Creek in the Town of Edson. Approach roadway also was designed as part of this project. The new bridge is a 44-foot-long single-span concrete flat slab structure on sill-type A1 abutments. Our design work complied with requirements of the Wisconsin… Read More »