Archive
New Jersey Route 52 Bridge H&H Analyses
Ayres performed tidal hydraulic, scour, and stability analyses for the proposed Route 52 bridge replacement over Great Egg Harbor Bay. The modeling determined design discharge rates, water surface elevation, flow depths, and flow velocities along the proposed bridge alignment. Scour analyses were performed for the 100- and 500-year storm tide events. Long-term lateral and vertical… Read More »
US 41 Brown County
This project is one of several segments of the US 41 Corridor that will be expanded from four to six lanes to increase capacity along the highway in Brown and Winnebago Counties as part of a $1.5 billion mega project. The construction cost for this segment was approximately $240 million. Ayres’ services for this section… Read More »
Caley Drive Piney Creek Crossing
The East Caley Drive crossing of Piney Creek in Centennial, Colorado, had been a low water crossing since the 1970s, but it had increasingly become a safety hazard. The Urban Drainage and Flood Control District and the Southeast Metro Stormwater Authority retained Ayres to evaluate alternatives for the crossing and to design stream stabilization and… Read More »