Archive

Forest CTH C Reconditioning

The Forest County Highway Department retained Ayres to design the reconditioning of 11.1 miles of Forest CTH C, including raising the grade and installing new drainage pipes as part of the reconstruction of one intersection. Ayres provided survey, environmental documentation, and preliminary and final roadway design. The project required extensive agency coordination with Forest County,… Read More »

Douglas CTH M over Tamarack

The Douglas County Highway Department retained Ayres to design the realignment of CTH M and the replacement of a bridge over the Tamarack River. The road has several substandard curves, and closing the road during construction would have resulted in a 20-plus-mile detour. Several alternative alignments were studied to improve the roadway while also allowing… Read More »

USH 53/USH 63 Trego Interchange

The Wisconsin Department of Transportation’s Northwest Region retained Ayres to upgrade the at-grade intersection of USH 53 and USH 63 in Trego to a full-service interchange to improve traffic flow and safety. WisDOT presented a 2023 Excellence in Highway Design Consultant Rural Design Award to the project. The project involved extensive traffic analysis of existing… Read More »