Archive

Winnebago CTH T Reconstruction

Winnebago County retained Ayres to design the reconstruction of 4.25 miles of CTH T. Included in the design was a 0.25-mile segment of four-lane roadway, a 0.5-mile urban section, and a 3.5-mile rural section. Ayres also completed a feasibility study for two roundabouts to improve traffic flow in the rural section, using RODEL software to… Read More »

Business 53 Rehabilitation & Reconstruction

The Village of Lake Hallie chose Ayres to design the rehabilitation and reconstruction of about 2 miles of Business 53 from Melby Street to STH 124. The project included public meetings, traffic analysis, survey, a Phase 1 environmental site assessment (ESA), preparation of an opinion of probable costs, and construction observation. No changes to existing… Read More »

ATC Access Road

Ayres assisted with the replacement of a transmission line along a 30-mile corridor between Boscobel and Lone Rock in southwest Wisconsin. A significant task of this project involved design and plan preparation for a new 1.5-mile access road to aid in the construction of the new line on the bluffs above the Wisconsin River and… Read More »