Archive

Oconto Falls STH 22

This project included 1.67 miles of two-lane urban surface repairs and reconstruction beginning at West Highland Drive and ending at East Highland Drive in the City of Oconto Falls. The section of STH 22 between West Highland Drive and Cherry Avenue was rehabilitated with concrete pavement repairs, and the urban section from Cherry Avenue to… Read More »

Menasha Third Street Bridge

The City of Menasha hired Ayres to design the replacement of the Third Street bridge over the Lake Winnebago Slough on an accelerated schedule, along with reconstruction of the bridge approaches. This project involved replacing a single-span concrete deck girder bridge approximately 0.6 mile east of Third Street’s junction with STH 114. The previous structure… Read More »

EOG Open Pit Sand Mining

EOG Resources retained Ayres to provide ongoing site selection, reclamation, stormwater, survey, and environmental services for an open pit sand mining operation in Chippewa County. Services include: • Stormwater design, permitting, and inspection • Site selection analysis • Site design, permitting, bidding, and inspection • Boundary, ALTA, and topographic surveying • Environmental assessment and investigation… Read More »