Archive

Kewaunee CTH S Ahnapee River Bridge

The Kewaunee County Highway Department retained Ayres to design the replacement of the CTH S bridge over the Ahnapee River in Algoma. The design was for the replacement of a single-span steel through girder bridge, which was approximately 105 feet long with a clear roadway width of 26 feet. The bridge was a fracture-critical structure,… Read More »

North Webster Avenue Reconstruction

The City of Green Bay hired Ayres to design the complex North Webster Avenue reconstruction project, which stretches 0.84 mile from just north of the East River to Radisson Street. The project had been a City planning priority since 2007. The project won the 2020 Project of the Year Award from the American Public Works… Read More »

SH 392 Widening at CR 13

Ayres provided the design for drainage improvements at the intersection at CR 13 and along the widening of SH 392 from 17th Street in Windsor to 1.5 miles west of CR 13, along with a pedestrian bridge connecting with the Poudre River Trail. Ayres performed the hydraulic design of the pedestrian bridge within HEC-RAS, starting… Read More »