Archive

Storm Drain Assessment

The City of Cheyenne retained Ayres to determine the cause of odors associated with the storm drain system in the City’s historic downtown area. Ayres professionals trained in confined space entry entered an 84-inch storm drain to perform a condition assessment, document standing water or non-stormwater flow, take liquid samples, and remove debris encountered in… Read More »

US 51/CTH U/CTH K/B51 Interchange

Ayres designed the reconfiguration and reconstruction of the US 51/CTH U/CTH K/Business 51 interchange ramps and service roads to improve geometrics, safety, and access. The Wisconsin Department of Transportation (WisDOT) North Central Region project in Wausau eliminates vertical clearance deficiencies at the CTH U overpass. Ayres prepared construction plans for the reconstruction of US 51… Read More »

Cheyenne West Edge Brownfield

The City of Cheyenne sought a way to turn around the downward trend in a 35-acre area of barren land ridden with an ill-defined patchwork of environmental contamination that palpably stymied attempts to make redevelopment feasible for private and public sector stakeholders. The City turned to Ayres to combine the goals of improved land use,… Read More »