Archive
Oconto Falls STH 22
This project included 1.67 miles of two-lane urban surface repairs and reconstruction beginning at West Highland Drive and ending at East Highland Drive in the City of Oconto Falls. The section of STH 22 between West Highland Drive and Cherry Avenue was rehabilitated with concrete pavement repairs, and the urban section from Cherry Avenue to… Read More »
Business 53 Rehabilitation & Reconstruction
The Village of Lake Hallie chose Ayres to design the rehabilitation and reconstruction of about 2 miles of Business 53 from Melby Street to STH 124. The project included public meetings, traffic analysis, survey, a Phase 1 environmental site assessment (ESA), preparation of an opinion of probable costs, and construction observation. No changes to existing… Read More »
ATC Access Road
Ayres assisted with the replacement of a transmission line along a 30-mile corridor between Boscobel and Lone Rock in southwest Wisconsin. A significant task of this project involved design and plan preparation for a new 1.5-mile access road to aid in the construction of the new line on the bluffs above the Wisconsin River and… Read More »