Dunn CTH Q Reconstruction

The Dunn County Highway Department selected Ayres to design the replacement of 3.3 miles of pavement on Dunn CTH Q from STH 29 to I-94. Improvements included the realignment of a few horizontal curves and improved stopping sight distance through modifying the vertical alignment at spot locations. An urban roadway section including curb and gutter… Read More »

USH 10 Over Plum Creek Bridge

Ayres provided design engineering services for the replacement of the Plum Creek bridge and approaches on USH 10 in Pierce County, Wisconsin. This project was unusual because the chosen alternative involved a shorter, single-span bridge in place of the existing five-span bridge built in the 1950s. Hydraulic analysis showed the old structure was larger than… Read More »

Columbia CTH V Reconstruction

Columbia County hired Ayres to design the reconstruction of approximately 4 miles of CTH V from STH 113 to CTH J. The westerly 2-mile segment of the project passes through a highly developed residential area serving many private residences along the shorelines of Lake Wisconsin. The roadway in this area is to be reconstructed as… Read More »