Archive
Plymouth ADA Transition Plan
The City of Plymouth recognized the importance of providing recreational facilities that meet the needs of all residents. The City hired Ayres to assess all parks and publicly accessed facilities within the City and develop an Americans with Disabilities Act Transition Plan. The project included in-depth review of the physical conditions in 18 parks, two… Read More »
Fort Atkinson Robert Street Bridge
The Wisconsin Department of Transportation (WisDOT), Southwest Region, retained Ayres to provide roadway design for the rehabilitation of the bridge carrying Robert Street over the Rock River in Fort Atkinson. Ayres’ portion of the project included reports; agency and utility coordination; public involvement; 60% and 90% plans; and final plans, specifications, and estimates (PS&E). The… Read More »
Bong Memorial Bridge Rehabilitation
The Wisconsin Department of Transportation hired Ayres to design the rehabilitation of the 1.5-mile-long Bong Memorial Bridge and its 1.3-mile urban approach in Superior. The project included placing a concrete deck overlay on approximately 600,930 square feet of existing bridge deck and replacing the 18 sets of modular expansion joints and six strip seal joints.… Read More »
