Archive

Appalachian Region Floating Bulkhead

This hydroelectric facility in the Appalachian Region has nine spillway bays with large slide gates. To repair gates, a floating bulkhead was required to dewater each bay. Five spillway bays have a recessed ogee crest, and an extension was required on the bottom caisson to dewater the bays. The far-left bay required custom design of… Read More »