Archive

Winnebago CTH T Reconstruction

Winnebago County retained Ayres to design the reconstruction of 4.25 miles of CTH T. Included in the design was a 0.25-mile segment of four-lane roadway, a 0.5-mile urban section, and a 3.5-mile rural section. Ayres also completed a feasibility study for two roundabouts to improve traffic flow in the rural section, using RODEL software to… Read More »

UW-Eau Claire Steam Loop

Ayres provided civil, mechanical, and electrical services associated with a new steam and condensate loop from Phillips Hall to Garfield Avenue on the University of Wisconsin-Eau Claire’s lower campus. The project involved: Removal of the existing steam and condensate pipes and tunnels from Phillips Hall to Schofield Hall. Construction of a new concrete box conduit… Read More »

US 41 Corridor Survey

Ayres is on the US 41 Corridor Team supplying on-call survey support mobilizing on-site for survey tasks that arise during the design and construction of the project, which involves major upgrades of 14 miles of US 41 in Brown County and 17 miles in Winnebago County. The project includes expanding the roadway from four lanes… Read More »