Clarifying & Designing Where Rivers & Infrastructure Meet

Job No. 1 for our team is designing for the healthy interaction between river systems and infrastructure – most commonly bridges and dams. But it’s not enough to design a solution. If our client does not understand how the solution works and how it is sustainable against – as well as with – the forces of nature, then we have not done our job. We want you to feel confident in our work not only because of our long legacy of excellence, but also because we have effectively communicated the “how” and “why” behind our designs and analyses.

Next: Partnering

Partnering for Excellent Outcomes

Aligning with your mission and pursuing your goals is what gets us out of bed in the morning. We are in our element when you invite us to come beside you to work as a collaborative team to investigate and quantify a problem, pursue multiple possible solutions, and take one of those alternatives to the finish line. We are at home within a large, world class, multidisciplinary team of experts who share our passion for creative solutions that safely place infrastructure alongside one of our greatest natural resources.

Next: Applied Mastery

Applied Practical Mastery

Why do our clients trust us? We are certified national instructors of hydraulics courses, and we’ve literally written the book on many river-related topics. Our decades of leadership in developing federal manuals and trainings relating to bridge and culvert hydraulics and scour allow us to quickly and confidently identify pragmatic solutions. Understanding the practical reasoning behind federal guidelines significantly flattens our learning curve and takes us right to sound solutions.

Next: Quality

Quality Driven by Expertise

Quality matters so much to Ayres’ river and water resources experts that it is built into our processes. Quantitative analysis informs the development of each project, and lessons learned from each project are captured and fed back into our training and processes.

Our goal is constant improvement of the state of our practice, and what motivates us is protecting the traveling public, which relies on the infrastructure we design in and around powerful bodies of water.

Next: Clarifying

×

Market

State + Federal + Tribal

Client

Colorado DOT

Location

Various Locations, CO

Ayres has carried out over 50 task orders over the course of two five-year master contracts to provide riverine design and review services through hydraulic and hydrologic analysis and design and fluvial geomorphic assessment across the northeastern quadrant of Colorado. Six tasks are in progress, including 1D and 2D modeling (3D also available), floodplain permitting, review, design support, field assessments, hydrology, scour, and countermeasure design.

Project Highlights

  • Rapid Hydraulics Response & Assessment
  • Permanent Flood Repairs
  • Hydraulic Model Review
  • Trusted Partner to Colorado DOT

Services Provided

  • Bridge Opening Design
  • Scour Analysis & Countermeasure Design
  • Bank Stability
  • Embankment Protection

Markets:

Next: FHWA NHI Teaching & Manuals

×

Market

State + Federal + Tribal

Client

FHWA

Location

Various Locations, US

Over several decades FHWA has trusted Ayres to develop courses and instructional materials to equip engineers around the nation with critical skills and tools to enhance infrastructure resilience through hydraulic analysis and design. Ayres has also provided personnel to deliver instruction around the nation and in virtual environments. Several of our staff have received NHI awards for their excellence as FHWA course instructors.

Project Highlights

  • Countermeasure Design for Bridge Scour & Stream Instability
  • Scour & Countermeasure Design for Bridge Abutments
  • Culvert Design
  • Introduction to Highway Hydraulics
  • 2D Hydraulic Modeling of Rivers at Highway Encroachments

Services Provided

  • Course & Manual Development & Revisions
  • Instructor-Led Trainings
  • Virtual Instructor-Led Trainings

Markets:

Next: Cottonwood Creek Stabilization

×

Market

Local Government

Client

City of Colorado Springs

Location

Colorado Springs, CO

The City of Colorado Springs Stormwater Enterprise hired Ayres to design long-term channel stabilization for approximately 3,000 feet of Cottonwood Creek. Ayres’ survey and subsurface utility engineering operations supported this effort to reduce future maintenance demands along the creek. See the project site on Ayres Site View.

Project Highlights

  • 2D Hydraulic Analysis
  • SUE Assessment at 30% Design
  • Construction Stormwater Management Program Plan
  • General Erosion Control Plans
  • Channel Design Reports

Services Provided

  • Channel Stabilization Design
  • Environmental & Floodplain Permitting
  • Land Survey
  • Electromagnetic Induction Locating

Markets:

Next: CDOT Bridge & Culvert Hydraulics

×

Market

State + Federal + Tribal

Client

Colorado DOT

Location

Various Locations, CO

Region 1 services involved emergency flood and culvert support, including flood damage assessments, repair evaluations, and scour countermeasures for corridors including US 34 and 36. For Region 4, Ayres completed hydraulic design for the replacement of Front Range timber bridges. Services included 2D hydraulic analyses, scour calculations and countermeasures, and floodplain permitting.

Project Highlights

  • Nearly $1 Million in Savings from Shortened Bridge Openings
  • Accelerated Schedules
  • Construction Manager/General Contractor Delivery Method

Services Provided

  • Hydraulic Analysis
  • Structural Design
  • Scour Calculations & Countermeasures
  • Emergency Assessments & Repairs

Markets:

Next: Yale Dam Bulkhead

×

Market

Development + Commercial

Client

JR Merit Industrial Contractors

Location

Ariel, WA

Ayres designed a floating bulkhead for use at several spillways. Many dams have operating gates that require dewatering for maintenance or for periodic operation to confirm they can be fully opened during high flows. A floating bulkhead comprises caissons that can be placed in a reservoir, pinned together, and floated into position upstream of the spillway that is to be dewatered.

Project Highlights

  • Alternatives to Floating Bulkheads Either Expensive or Disruptive to River
  • Lower Caissons Flooded with Water to Allow for Vertical Positioning to Seal Gate
  • Bulkhead Can Be Refloated and Moved to Spillway Bay with Similar Geometry

Services Provided

  • Floating Bulkhead Design
  • Structural Design

Markets:

Next: Orono Dam Inspection & Hoist Evaluation

×

Market

Local Government

Client

City of Elk River

Location

Elk River, MN

Ayres provided many services on Orono Dam, initially providing a walking safety inspection and updates to the emergency action plan. Ayres found low spots, erosion concerns, and gate bolt and drain issues. The City later called Ayres when Gate 1’s hoist failed and the fabrication company needed an accurate gate weight, cable length, and hoist capacity.  Ayres' ropes team climbed the gate, computed its weight, and analyzed pin and side seal friction.

Project Highlights

  • Client Commended Thorough Inspection & Budgeted for Repairs
  • Full Spillway & Dam Safety Evaluation
  • Scour Probing Completed Near Flip Bucket Spillway
  • Gate Weight Calculated Based on Measurements

Services Provided

  • Walking Safety Inspection
  • Emergency Action Plan Updates
  • Weight and Measurement Calculations

Markets:

Next: Clam Falls Dam Replacement

×

Market

Local Government

Client

Polk County

Location

Polk County, WI

Ayres designed improvements to Clam Falls Dam, which impounds the Clam Falls Flowage immediately downstream of the County I bridge. The existing dam consisted of an undersized slide gate spillway and a decommissioned powerhouse. Ayres designed post-tension anchors and concrete improvements to increase the spillway capacity and stabilize the powerhouse.

Project Highlights

  • Enlarged, Gated Spillway Section
  • Fixed-Crest Spillway Section
  • Flowable Fill to Abandon Powerhouse
  • Structural Stabilization with Post-Tensioned Anchors

Services Provided

  • Spillway Design
  • Powerhouse Abandonment & Stabilization
  • Bidding Assistance
  • Construction Administration & Observation

Markets:

Next: Comprehensive Assessments Master

×

Market

Energy + Utilities + Tech

Client

WEC Energy Group

Location

Various Locations, WI

The first comprehensive assessment (CA) and Level 2 risk analysis in this five-year IDIQ contract involved Castle Rock Dam, which is 3.5 miles long and has 18 tainter gates. Over 200 potential failure modes were proposed; about 50 were developed and evaluated. This was the first formal risk analysis within FERC's Chicago Region and set the bar for others. Subsequent CAs involved six Wisconsin dams.

Project Highlights

  • Ayres' FERC Approval Rate One of Nation's Best
  • LifeSim Consequences Modeling
  • HEC-RAS 2D Modeling
  • Life Loss & Economic Loss Predictions
  • Screening Analyses for Static & Seismic Liquefaction
  • Piezometer & Seepage Flow Record Reviews

Services Provided

  • Level 2 Risk Analyses
  • Hydro Survey
  • Spillway Gate Analysis
  • Post-Flood UAS Flights

Markets:

Next: Fossil Creek Stream Rehabilitation

×

Market

Local Government

Client

City of Fort Collins

Location

Fort Collins, CO

Building upon three previous Ayres stream rehabilitation/enhancement projects upstream, this project aims to analyze Fossil Creek between Lemay Avenue and Trilby Road in Fort Collins and design improvements that rehabilitate the natural stream channel morphology, reconnect floodplain areas, improve aquatic and riparian habitat, address erosion and sediment transport concerns, improve resilience, and protect Southridge Golf Course.

Project Highlights

  • 2D Hydraulic Modeling
  • Bank Stabilization
  • Erosion & Deposition Analysis
  • Updated Imagery, Lidar & Survey

Services Provided

  • Hydraulic Modeling & Floodplain Mapping
  • Geomorphic Analysis
  • Utility Location Services
  • Section 404 Clean Water Act Permitting
  • Community Engagement
  • Stream Restoration & Habitat Enhancement Design
  • Construction Support

Markets:

Next: Cameron Peak Fire Recovery

×

Market

Local Government

Client

BTWC

Location

Larimer County, CO

Ayres assisted Larimer County and the Big Thompson Watershed Coalition in mitigation projects to protect valuable assets at risk after the Cameron Peak Fire. This included design recommendations and construction oversight support at two severely impacted locations. Ayres worked with the County, landowners, and the NRCS to remove severe debris deposition and complete channel alignment designs for efficient conveyance of water and sediment.

Project Highlights

  • Established Construction Oversight Procedures
  • Client’s Staff Fully Integrated to Lead Construction
  • 100+ Installations in 2-Mile Section of Elk Creek

Services Provided

  • Low-Tech Process-Based Restoration
  • Post-Assisted Log Structures
  • Beaver Dam Analog Structures

Markets:

Next: Nevada DOT Scour Compliance

×

Market

State + Federal + Tribal

Client

Nevada DOT

Location

Various Locations, NV

Ayres is helping the Nevada DOT to comply with the FHWA's National Bridge Inspection Program Metric 18 pertaining to evaluating and managing scour around bridge piers and abutments. This includes organizing existing documentation, screening undocumented bridges, appraising bridges, and completing plans of action (POAs) for new scour-critical bridges. Ayres also is updating existing scour-critical bridges' POAs.

Project Highlights

  • Screening for Scour Susceptibility & Vulnerability
  • Hydrologic & Hydraulic Analyses of High & Medium Risk Bridges
  • Sour Evaluations for High & Medium Risk Bridges

Services Provided

  • Scour Evaluations
  • Plan of Action Updates
  • As-Needed Hydrologic & Hydraulic Analyses
  • As-Needed Modeling
  • As-Needed Design Services

Markets:

Next: Brillion Iron Works Redevelopment

×

Market

Local Government

Client

City of Brillion

Location

Brillion, WI

Ayres conducted a preliminary wetland assessment to assist with project design while the site was outside the growing season required for wetland delineation. Ayres completed an official wetland delineation during the following growing season and coordinated with the Wisconsin Department of Natural Resources to determine which wetlands were artificial and which were subject to regulation.

Project Highlights

  • 10 of 15 Delineated Wetlands Declared Artificial
  • Historical Site Manipulation Complicated Wetland Evaluation

Services Provided

  • Wetland Delineation & Hydraulic Modeling
  • Visioning & Master Planning
  • Grant Writing & Management
  • Park & Pedestrian Planning
  • Environmental Assessment & Remediation
  • Bridge & Culvert Inspection & Design
  • Deconstruction Observation

Markets:

Next: Mlsna Dam Removal

×

Market

Local Government

Client

Vernon County, WI

Location

Westby, WI

Mlsna Dam, a dry flood-control dam, was breached during a 2018 flood. Vernon County decided to decommission and remove the dam because of stability issues associated with its sandstone abutments and a history of recent dam failures in Wisconsin's Driftless Region. Ayres designed the dam removal and stream restoration.

Project Highlights

  • Assisted with Wisconsin DNR Permitting
  • Incorporated Innovative & Eco-Friendly Improvements
  • Design Included Live Willow Plantings & Large Woody Debris
  • Naturally Landscaped Rock Used Where Failure Risk Higher

Services Provided

  • Dam Removal Design
  • Stream Restoration Design

Markets:

Next: CDOT Hydraulics Five-Year Master

“

The technical capabilities Ayres exhibits are unparalleled in my Region. They have established themselves as experts in hydraulic analysis (1D and 2D), GIS, and terrain modeling that supports roadway design. Their assistance on the US 34 Big Thompson Canyon helped establish them as the go-to organization for river and bridge revetment design and construction.

Brian Varrella, Hydraulics Unit Lead, Colorado DOT Region 4

”
“

During the I-25 North Segment 5 project … (Matthew Hickox’s) expertise ensured that the designs remained technically sound and well-informed while maintaining alignment with project goals. He also leveraged his strong relationships with the surrounding local agencies to expedite submittal reviews.

James Zufall, Civil Engineering Project Manager, Colorado DOT Region 4

”
“

Ayres did a great job of taking on the project. Their willingness to jump in at a time when we thought we were facing a really substantial cost increase was so important. After working with them, it's clear we should have chosen Ayres in our first go-round, based on how great they've been to work with.

Joshua Petersen, Senior Water Resources Engineer, Dakota County, MN

”

Your challenges aren't one-size-fits-all.

See how we adapt for your market. Two employees at a project, smiling.
What is a comprehensive dam assessment?
+
-

New Federal Energy Regulatory Commission rules took effect in 2022 requiring periodic comprehensive assessments of hydroelectric dams. Ayres was among the initial consulting firms properly equipped to conduct assessments according to the new requirement for deeper risk assessments – requiring approximately 10 times the effort of previous dam assessments while also taking two years to complete, compared with a few weeks under the old rules. Essentially the new assessments require experts to ignore previous assumptions and inspection reports and instead gather as much historical information as possible. Among the tools used are two-dimensional floodplain modeling, aerial lidar, bathymetric data, public inventories of nearby buildings, census data, GIS, drone flights, local libraries, construction records, reviews of past dam failures, and evaluation of dams that have withstood the test of time.

Can engineers make rivers more stable and resilient in high-water situations?
+
-

An engineering consultant that specializes in hydraulic analysis and river engineering can combine field reconnaissance with computer and physical hydraulic modeling to deliver solutions. Ayres is a firm whose expertise is recognized by federal clients, partly because the firm has written river engineering design manuals and standards that are in use nationwide. A capable firm goes beyond traditional riprap to provide lasting channel protection. After a thorough geomorphic investigation documenting channel conditions, a consultant designs customized bank stabilization, restoration, and river engineering structures. Innovative solutions include partially grouted riprap, articulated concrete block and fieldstone streambed linings, fish-friendly pool-and-riffle beds, concrete A-jacks bank protection, fabric-encapsulated slopes, embedded root wads, soil trenches, and native seed mixes.

How can lake associations and districts be proactive about water quality?
+
-

Hiring a specialized consultant with watershed hydrology and water quality evaluation experience can help lake associations and districts evaluate lakes and identify changes in water quality. Available services include management plans, aquatic plant surveys, lakeshore owner surveys, lake sampling, grant applications, watershed modeling, dam and spillway design, dam break analysis, shoreline restoration, and runoff water quality improvement.

What is a hinged floating bulkhead, and how does it work?
+
-

Developed by Xcel Energy and engineers at Ayres, the award-winning hinged floating bulkhead has become a valuable tool, particularly in dewatering tainter gates for rehabilitation and testing. The system has been used at projects across the nation to safely, efficiently, and cost-effectively dewater spillway gates and powerhouse intakes. The bulkhead caissons can be launched from shore, floated to the structure, and then filled – section by section – with water to quickly close off and dewater each gate for inspection and/or maintenance.

What is a Wisconsin Department of Natural Resources Assured Wetland Delineator?
+
-

This designation means that the wetland delineator who holds this designation can move wetland delineation reports through the approval process more quickly than other delineators. Wetland delineation reports sent to the Wisconsin Department of Natural Resources by an assured wetland delineator are approved without the usual WDNR field verification that must be done for reports submitted by other wetland delineators, saving clients up to 60 days on approvals, as well as related fees charged for these verifications.