Archive
Whispering Willow Wind Farm
Ayres teamed with HDR to provide Alliant Energy with civil design, land survey, aerial photogrammetrics, and lidar (light detection and ranging) data for the Whispering Willow Central Wind Farm project in Franklin County, Iowa. The project consisted of 60 turbines spread over a 50-square-mile area. Civil design tasks included the design of access roads, crane… Read More »
EOG Open Pit Sand Mining
EOG Resources retained Ayres to provide ongoing site selection, reclamation, stormwater, survey, and environmental services for an open pit sand mining operation in Chippewa County. Services include: • Stormwater design, permitting, and inspection • Site selection analysis • Site design, permitting, bidding, and inspection • Boundary, ALTA, and topographic surveying • Environmental assessment and investigation… Read More »
Lake Lisa Park Improvements
Pasco County Facilities Management retained our team to provide geotechnical, ecological, and civil engineering services as well as the permit preparation and application for the Lake Lisa Park Improvements. We prepared the conceptual design to determine placement of amenities and to route the walking trails throughout the site. Lake Lisa Park amenities include a 20-by-46-foot… Read More »



