Cumberland Water Tower
When stimulus grant funding became available in 2009, Ayres met challenging deadlines to help Cumberland receive a Wisconsin Department of Natural Resources low-interest loan and grant to finance much-needed water system improvements. Ayres completed final project plans and specifications in less than three weeks to meet a WDNR application deadline.After receiving the $1.2 million loan… Read More »
Fox Point Footbridge
The Village of Fox Point retained Ayres to evaluate alternatives for the Bridge Lane Ravine Footbridge and provide necessary design work. Services involved preparing preliminary designs and cost estimates for each of the three alternatives: repair/rehabilitation, replacement, and removal of the bridge. Replacement was chosen as the preferred solution. The project won a 2015 Public… Read More »
Pleasant View Road Design
The City of Madison selected Ayres to complete the environmental document, design reports, agency coordination, traffic analysis, utility coordination, public involvement, survey, plat preparation, preliminary and final roadway plans, and culvert underpass and retaining wall plans for the Pleasant View Road project. The new corridor was designed within a tight time frame as a four-lane… Read More »