Archive

Pigeon River Bridge

The Town of Meeme and the Wisconsin Department of Transportation, Northeast Region, retained Ayres to design the replacement of the County Line Road bridge over the Pigeon River. The existing 30-foot-long concrete deck girder bridge was replaced with a 42-foot-long single-span concrete flat slab bridge on spill-thru (A-1) abutments. The bridge has a 30-foot clear… Read More »

Portage CTH J Overpass

CTH J is a major collector that crossed the Canadian National Railroad about 6 miles east of Stevens Point. The railroad anticipated adding a second track, which would significantly increase the number of trains passing through the area on any given day. Even with 31 trains per day on the single track, the average crash… Read More »

Ellsworth Elementary School

Ayres collaborated with consultant Ted Rozeboom and Healy | Bender on the design of a new 108,000-square-foot, five-section elementary school for 750 students. Ayres provided site/civil and landscape architecture services. Improvements include two new playgrounds to separate the older and younger students, a full-size practice football field, and an event plaza with an outdoor classroom.… Read More »