Archive
Collins Road Improvements
As part of the Better Jacksonville Plan, the City of Jacksonville hired Ayres to provide engineering services for major reconstruction of 2 miles of Collins Road from Blanding Boulevard to Rampart Road. The project involved providing the study, design, and construction plans to expand the roadway from a two-lane rural section to a four-lane, median-divided… Read More »
Collins Road Extension Final Design
As part of the Better Jacksonville Plan, this project continued the Collins Road preliminary engineering study, extending Collins Road approximately 1.5 miles from Shindler Drive west to a new intersection with Old Middleburg Road. Ayres designed the roadway with a four-lane urban section with two 12-foot travel lanes and a 4-foot bike lane in each… Read More »
DeForest South Street Bridge
The Village of DeForest and the Wisconsin Department of Transportation selected Ayres to design a bridge replacement along South Street over the Yahara River. The project included removing the deteriorated single-span two-lane bridge and replacing it with a single-span, two-lane structure, including sidewalk, lighting, and decorative railing along one side of the bridge. Aesthetic treatments… Read More »