Archive
Fossil Creek Rehabilitation
The City of Fort Collins hired Ayres to develop an overall vision for the Fossil Creek Basin and site design for the restoration of approximately 2,500 feet of Fossil Creek from the confluence with Mail Creek downstream to Lemay Avenue. The project received top priority in a Colorado State University study commissioned by the City… Read More »
Santa Ana Rio Grande Bar 3
The Pueblo of Santa Ana retained Ayres to provide pre- and post-construction topographic survey, hydraulic modeling and design, and construction specifications for plantings and the creation of channels with the goal of improving habitat along this area on the eastern shoreline of the Rio Grande. Known as Bar 3, the project area was lowered in… Read More »
Menekaunee Harbor Restoration & Park
The City of Marinette hired Ayres to provide design services relating to redevelopment of an existing industrial area into a recreational area. The project consisted of dredging contaminated sediment from the harbor area, demolition of an existing industrial site, restoration of the river harbor and shoreline, and development of Menekaunee Harbor Park and Boat Launch.… Read More »