Archive
I-90 / US 53 / STH 35 Interchange
The Wisconsin Department of Transportation (WisDOT), Southwest Region, retained Ayres to design the reconstruction of the US 53/STH 35 interchange with I-90 at La Crosse, along with reconditioning 2.4 miles of I-90 and improvements for 13 bridges along the segment. The project required a wide breadth of transportation engineering expertise to create a welcoming interstate… Read More »
US 41 Brown County
This project is one of several segments of the US 41 Corridor that will be expanded from four to six lanes to increase capacity along the highway in Brown and Winnebago Counties as part of a $1.5 billion mega project. The construction cost for this segment was approximately $240 million. Ayres’ services for this section… Read More »
USH 53/USH 63 Trego Interchange
The Wisconsin Department of Transportation’s Northwest Region retained Ayres to upgrade the at-grade intersection of USH 53 and USH 63 in Trego to a full-service interchange to improve traffic flow and safety. WisDOT presented a 2023 Excellence in Highway Design Consultant Rural Design Award to the project. The project involved extensive traffic analysis of existing… Read More »