ATC Bay Lake Transmission Line
American Transmission Company retained Ayres to aid in the design and construction of a proposed 40-mile electric transmission line in northeastern Wisconsin. Because of time constraints, two 40-mile routes are being designed, and one 40-mile route will be constructed. Services included providing parcel mapping for 800 properties, developing easement exhibits for these 800 parcels, providing… Read More »
Whispering Willow Wind Farm
Ayres teamed with HDR to provide Alliant Energy with civil design, land survey, aerial photogrammetrics, and lidar (light detection and ranging) data for the Whispering Willow Central Wind Farm project in Franklin County, Iowa. The project consisted of 60 turbines spread over a 50-square-mile area. Civil design tasks included the design of access roads, crane… Read More »