Archive
Waukesha County I-43 Upgrade
This project involves rehabilitating or resurfacing about 12 miles of I-43 between STH 83 and CTH O. The project includes multiple project segments with construction spread over several years.The southern 7-mile segment from STH 83 to south of STH 164 involves rubblizing and resurfacing with HMA pavement, along with rehabilitation of 10 structures by either… Read More »
US 8 Pavement and Roundabout
The Wisconsin Department of Transportation, Northwest Region, retained Ayres to prepare preliminary and final plans for pavement replacement on US 8/STH 35 in St. Croix Falls. WisDOT contracted separately with Ayres to design the US 8/208th Street intersection as a roundabout. The 2.3-mile pavement replacement project included joint repair and overlay of an existing brake… Read More »
Hoan Bridge Traffic Analysis and TMP
Ayres provided preliminary traffic analysis for the Hoan Bridge project, including evaluating existing traffic along I-794 over the Hoan Bridge and lane requirements for the 20-year (2035) and 40-year (2055) projected traffic volumes. HCS and Paramics software were used to analyze the feasibility of reducing travel lanes along the Hoan Bridge, and a summary of… Read More »